Analysis on The Recovery of the Condensate from Effect II Evaporator and the Influnence on the Boiler
Article Abstract: In the previous period, intermittent coil blast caused by scale and corrosion to the boiler of our company and corrosion, some people hold that it is caused by the recovery of the condensate from Effect Ⅱ evaporator as boiler make-up water. Based on the aspects of application by other companies,operation of make- up water in our company,operation and maintenance of equipment and the preparation equipment for make-up water,this paper analyzes the reasons leading the make-up water to fail to reach standard.h has been proved that the quality of the condensate from the Effect Ⅱ evaporator can completely meet the need of the boiler water.
About Author:
Author: Huang Wei,Xin YahuiPublisher: CNSIC HaoLong Co.,Ltd. Pingdingshan Henan 467001
Keywords:Condensate from Effect Ⅱ evaporator,reason leading to unqualification,scale composition
New Journals
- Analysis of Reducing Vibration and Noise of Urban Mass Transit and Engineering Measures for Them
- Data Visualization of Chemical Compound IR Spectrum Utilizing SigmaPlot 10. 0 Sofeware
- Simulation of raindrops in virtual traffic environment
- Probe into MN98-type Small-current Grounding Devices
- Medical Equipment Suppler & Maintainer Query Database Based on Business Card Recognition Technology
- The 294 cases of the treatment of the Qixie Qiongshe Decoction to Qi asthenia and stasis stroke
- High Skilled Personnel of Human Resource Development Focus Selection
- Experimental Investigation of Diaphragm-Braced Two-Span Continuous Purlin Under Simulated Wind Uplift Loading
- Spatial patterns of Castanopsis eyrei and Schima superba in mid-subtropical broad-leaved evergreen forest in Gutianshan National Reserve,China
- The effects of high level of glucose on membrane fluidity